Download 200PEVP01

Transcript
PEV PULSEContents
2.3
CHAP. 2 - Installation
INSTALLATION OF BOARD
Fig. 1: Install the module on the DIN
guide and close the bottom clamp to
hold it in place.
Make all the electrical connections with reference to the diagrams of the relative
model (see the relative tables in the ANNEXES). During the cabling process, it is
advisable to keep the power conductors isolated from the signal conductors.
Page 6
USER AND MAINTENANCE MANUAL
Rev. 01-14
