VERTICAL SHAFT BRICK KILN
Setting up the
Machine
Setting up the Machine

Unload the machine from the truck safely

Set up the pipe line for water supply from
permanent reservoir or tanks

Set up the three phase electric supply to the
machine 32Amp, 415V, 50Hz (TPN) and cable
4/6mm2 (where electric supply is exists)

Check and tighten all the nut bolts, which might
loosen during transportation and unloading.

Put oil and grease on the moving parts.

Install valve to control the supply of water. Fill
the water tank with clean water
1
Manual Process of Starting the Engine
2
Unloading of the TBMM from Truck
For Electric Motor
16

Connect the machine’s main switch box;
direction of rotation is indicated on the machine

Switch on the electric connection and switch on
the 7.5HP electric motor

Check the direction of rotation, if OK then go to
next step but, if not OK then call an electrician
and change the electric connection. Similarly
switch on the 1HP Pump and check the water
circulation. If OK otherwise check the connection
Method of Engaging the Diesel Supply Valve