Download TARA BrickMek-SUPER - Knowledge Partnership Programme
Transcript
VERTICAL SHAFT BRICK KILN Setting up the Machine Setting up the Machine Unload the machine from the truck safely Set up the pipe line for water supply from permanent reservoir or tanks Set up the three phase electric supply to the machine 32Amp, 415V, 50Hz (TPN) and cable 4/6mm2 (where electric supply is exists) Check and tighten all the nut bolts, which might loosen during transportation and unloading. Put oil and grease on the moving parts. Install valve to control the supply of water. Fill the water tank with clean water 1 Manual Process of Starting the Engine 2 Unloading of the TBMM from Truck For Electric Motor 16 Connect the machine’s main switch box; direction of rotation is indicated on the machine Switch on the electric connection and switch on the 7.5HP electric motor Check the direction of rotation, if OK then go to next step but, if not OK then call an electrician and change the electric connection. Similarly switch on the 1HP Pump and check the water circulation. If OK otherwise check the connection Method of Engaging the Diesel Supply Valve USER MANUAL FOR SOFT MUD MOULDING TECHNOLOGY