Download User manual

Transcript
4.5 - Installation instructions
4.5 Installation instructions
4.5.1
Mounting
" Locate the junction box close to the transmitter and sampling valve
to achieve a convenient connection of the SPC-1000 hand-held
terminal for calibration and monitoring.
For convenient working height and a good operating position the bottom
of the junction box should be approximately 1.4 m (4.6 ft.) above the
floor. The SPC-1000 can be placed in a holder if one has been mounted
close to the junction box.
Install the box in a position where it is protected from mechanical damage.
50
2"
Fig 68 Recommended
clearances
" The front cover
swings open and is
hinged on the left
side.
300
12"
Sample
Enter
50
2"
200
8"
Terminal
Consistency
Transmitter
Sample
Enter
XCT-2300
217
8.5"
Fig 69 Dimensions
142
5.6"
AX218.56/3e
34
1.3"
285
11.2"
20
0.8"
Terminal
MEK-2300: JCT-1100 Junction box appendix
© BTG 2004
163