Download Programming Software Version 4.0 User Manual
Transcript
Programming Software User Manual BACK PANEL SWITCH SETTINGS Set CTS Switch to always ON (the 0, or down position). Set Switches SW1 through SW4 in the OFF position as shown in the figure below. This is the Single-Link setting. ↓ ↓ ON 1 2 3 Switch No. Function 1 Not used ON OFF 2 3 Operation 1:N 1:1 4 5V Power Supply Present Absent 4 Appendix C PLC Setup OpenPowerPanel Programming Software and configure Project Information as shown in the figure to the right. After selecting the PLC Type and Protocol, click on View/Edit PLC Com Setup. The PLC Attributes dialog box will appear. Enter the parameters shown. Click on the OK button to save your selections. You will return to the Project Information screen. Click on the OK button to begin creatingyour PowerPanel Project. NOTE on TAGs for this type PLC: If communicating to other than the default Host Link Unit, the address string must be preceded by the Host Link Number of the unit you want to communicate with. For example, 2-HR05 is Host Link Unit 2. C-20