Download SOC Facility Operations Manual - Integral
Transcript
Integral Science Operations Centre Facility Operations Manual Doc.No: INT-SOC-DOC-012 Issue: 1 r 6 Date: Page: 30 January 2004 iii Document Change Record Section Description / Reason Date Issue 15 Dec 1999 26 May 2000 14 July 2000 First Draft 0 r1 0 r2 All All All 27 Oct 2000 1 Nov 2000 20 Nov 2000 0 r3 1 1r1 21 May 2002 1r2 All See Change Bars All 7 Oct 2002 1r3 All 20 Nov 2002 1r4 30 Oct 2003 1r5 30 Jan 2004 1r6 See Change Bars See Change Bars All Produced to assist ISOC Software Integration & Testing. Updated to reflect comments from ISOC team. Document. Expanded pulling information from ISOC Ops Concept & Integral Design Report. Also includes Editorial Updates. Updated & restructured following internal (ISOC) review Formal Issue for start of AO-1 Call Procedures updated to reflect working experience. Some editorial corrections also made. PHS related procedures updated to bring them in line with the remodelled PHS Software. AO/TAC related activities updates to reflect 'as performed' AO 'lessons learnt' Information added to clarify ISOC ‘high level’ handling of external deliveries and more detailed handling of Event Designators. Procedures updated & added to reflect experience gained during Simulations & Training exercises. Procedures added to cover the reception of external deliveries and the importation of Event Designators. Concept of ISOC Science Team duty rotation included Updated to reflect comments received from D. Texier & E. Kuulkers. Several other editorial corrections added. Procedures for AO-2 support incorporated/updated along with several other minor procedural changes. Updated Post AO-2 & ISOC v10 release