Download SOC Facility Operations Manual - Integral
Transcript
Integral Science Operations Centre Facility Operations Manual Doc.No: INT-SOC-DOC-012 Issue: 1 r 6 Date: Page: 30 January 2004 60 The mission planners also maintain a list/table of pointing positions (RA & DEC) of each point with the GCDE, identified by Pattern ID & a Pointing number. Selecting a specific GCDE scan for scheduling. For AO-1 the proposal numbers started with 01999 & for AO-2 they start with 02999 etc. o From within PHS select "View Proposals" option o Select "ISWT survey" under "Type" & make "Type" active as a selection criterion o Select the ISWT GCDE and view the proposal by clicking on "Details". The GCDE, in AO-2, consists of seven different patterns. Each pattern defines two proposals. (For pattern 1 we have proposals 0299911 & 0299921; for pattern 2 we have proposals 0299912, & 0299922 etc.) An observation in each proposal consists of all the pointings within that pattern. Since a pattern is scanned more than once during the AO, there will be several “identical” observations within each proposal. The structure of the GCDE & its patterns are explaining in RD. 35. The activation/selection of a specific pattern (Proposal) & column (Observation) is performed in a manner similar to that of GPS. • • • • • • • To activate a particular GCDE scan for scheduling select the appropriate record(s) and click on "Checkout". Fill in the Earliest and Latest start times of that particular part of the scan. If the GCDE is to be scheduled at the beginning of a revolution the Start time should be set to a value at least 1 hour after perigee. When the Start & End times are entering the revolution number is automatically calculated & displayed. (Always check that the displayed revolution number is the correct one!) Enter also the Start Point and End Point of the GCDE (these values should be taken for the GCDE table maintained & published by the Mission Planning Responsible.). The Approved time should be updated by clicking on "Update Approved time." under Start Point of GCDE. When one has changed the necessary records "COMMIT" it and "DISMISS". Exit PHS The modified GCDE scan can now be called up in OSS