4.6.3.2.1 Identification of potential observations
Once the appropriate/available Sky Bins have been identified, the Mission Planner will search the
Proposal/Observation Database, using one or more ‘user definable’ sets of search criteria, for
suitable /potential observations to cover the period(s) defined in the Sky Bins.
The sort/selection criteria will cover things like:
- Scientific Priority,
- Observation Type (Fixed Time, Calibration etc.),
- Sky Bin Location,
- Instruments to be used,
- Whether part of an observation has already been observed? etc.
Normally much of this effort will not be required as the primary source for which observations are
to schedule & when is the LTP.
4.6.3.2.2 GPS and GCDE observations
Due to the fact that it is expected that most TOO candidates will be detected as part of the GPS &
GCDE data processing, the ISOC Mission Planner will, whenever possible, schedule the weekly
GPS & GCDE observations to be performed near the beginning of a week. Thus ensuring that the
observation related data should be available at the ISDC during the normal working week. In this
way it is hoped to shorten the TOO Turnaround Time. The optimum time for scheduling such
observations is believed to be late Sunday night or early Monday morning.
When it comes to scheduling the GPS & GCDE the ISOC Mission Planner will check his/her
records, and the LTP, to determine which scan or part of the GCDE is due to be performed. After
confirming this, using Starmap, the planner will select the appropriate observation and points within
it. BPS & GCDE observations are then schedule as fixed time observations.
4.6.3.2.3 Insertion of Calibration & Engineering Observations
Calibration or engineering observation are stored in the proposal database as fixed time
observations and as such require no special scheduling procedures. The mission planner will
however check that they have the correct start time, duration and required mode settings. These
observations are always scheduled as Fixed-Time observations and are handles as in the normal
manner. Some calibration may however impose more some additional constraints than others.
4.6.3.2.4 Sorting of Observations
Having extracted a list of observations, the Mission Planner, will have the capability of sorting
them further, using their database attributes. The outcome of these sorts will be displayable in both
graphical and tabular format. The Mission Planner will be able to print and save the results of the
sorts performed.
4.6.3.3 Generation of the POS & POD
With the preferred set & sequence of observations defined, the mission planner will use the
Observation Scheduling (OSS) System to merge the selected observations with the MOC provided
PSFs. The OSS will attempt to schedule the selected observations in order of their priority. The
ISOC Mission Planner, as part of the selection process, defines these 'scheduling' priorities. The
ISOC Mission Planner will normally give ‘Fixed Time’ observations and partially scheduled