Download xs series manual

Transcript
XS series operating manual
Information on cycle timing
Minimum cycle timing in dielectric strength test ( hipot test)
Measurement conditions :
Software revision
Measurement display
Interface
Rise time
Fall time
Hold time
Time
Other parameters
NO (second page of the setup menu)
PLC
0
0
1
AUTO
independent
• Test time = time between change of the MES_DCH (start test) signal and change of EOT (end of
test) signal = 980 mS
• Measurement parameters : same as above but with hold time = 0
Test time = 700 mS. In this case there is no output voltage control.
• Measurement parameters : memory number change between each measurement
Test time = basic minimum test time + 1.3 S
Minimum cycle timing in MEGOHMMETER
Measurement conditions :
Software revision
Measurement display
Interface
Measurement time
Other parameters
NO (second page of the setup menu)
PLC
0
independent
• Test time = time between change of the MES_DCH (start test) signal and change of EOT (end of
test) signal = 1.58 S
• Measurement parameters : memory number change between each measurement
Test time = basic minimum test time + 1.3 S
Minimum cycle timing in GROUND CONTINUITY
Measurement conditions :
Software revision
Measurement display
Interface
Rise time
Fall time
Hold time
Time
NO (second page of the setup menu)
PLC
0
0
1
AUTO
• Test time = time between change of the MES_DCH (start test) signal and change of EOT (end of test)
signal = 1.19 S
• Measurement parameters : memory number change between each measurement
Test time = basic minimum test time + 1.3 S
- 87 -