Download chapter 4

Transcript
GE HEALTHCARE
DIRECTION 5122546-100, REVISION 4
10-6-5-4
LOGIQ™ 3 SERVICE MANUAL
Data Sheet for Chassis Source Leakage Current
The test passes when all readings measure less than the value shown in Table 10-14. Record all data
on the PM Inspection Certificate.
Table 10-18 Typical Data Sheet for Chassis Source Leakage Current
Unit Power
Tester Polarity
Switch
Tester Neutral Test 1 Probe
or Ground
Connector
Switch
Screw
Test 3
Optional Test
Test 2
Screws on
4
Metal on
CRT
Rear Panel
Wheel
Housing
Connectors
Optional
Test 5
Enter Name of tested peripheral here:
10-6-6
10-6-6-1
ON
NORM
OPEN
ON
NORM
CLOSED
ON
REV
OPEN
ON
REV
CLOSED
OFF
NORM
OPEN
OFF
NORM
CLOSED
OFF
REV
OPEN
OFF
REV
CLOSED
Isolated Patient Lead (Source) Leakage–Lead to Ground
Definition
This test measures the current which would flow to ground from any of the isolated ECG leads. The
meter simulates a patient who is connected to the monitoring equipment and is grounded by touching
some other grounded surface. Measurements should be made with the ground open and closed, with
power line polarity normal and reversed, and with the ultrasound console Off and On. For each
combination the operating controls, such as the lead switch, should be operated to find the worst case
condition.
CAUTION Equipment damage possibility. Never switch the Polarity when the unit is powered ON. Be sure
to turn the unit power OFF before switching the polarity using the POLARITY switch. Otherwise,
the unit may be damaged.
Chapter 10
10-19