Download chapter 4
Transcript
GE HEALTHCARE DIRECTION 5122546-100, REVISION 4 10-6-5-4 LOGIQ™ 3 SERVICE MANUAL Data Sheet for Chassis Source Leakage Current The test passes when all readings measure less than the value shown in Table 10-14. Record all data on the PM Inspection Certificate. Table 10-18 Typical Data Sheet for Chassis Source Leakage Current Unit Power Tester Polarity Switch Tester Neutral Test 1 Probe or Ground Connector Switch Screw Test 3 Optional Test Test 2 Screws on 4 Metal on CRT Rear Panel Wheel Housing Connectors Optional Test 5 Enter Name of tested peripheral here: 10-6-6 10-6-6-1 ON NORM OPEN ON NORM CLOSED ON REV OPEN ON REV CLOSED OFF NORM OPEN OFF NORM CLOSED OFF REV OPEN OFF REV CLOSED Isolated Patient Lead (Source) Leakage–Lead to Ground Definition This test measures the current which would flow to ground from any of the isolated ECG leads. The meter simulates a patient who is connected to the monitoring equipment and is grounded by touching some other grounded surface. Measurements should be made with the ground open and closed, with power line polarity normal and reversed, and with the ultrasound console Off and On. For each combination the operating controls, such as the lead switch, should be operated to find the worst case condition. CAUTION Equipment damage possibility. Never switch the Polarity when the unit is powered ON. Be sure to turn the unit power OFF before switching the polarity using the POLARITY switch. Otherwise, the unit may be damaged. Chapter 10 10-19
Related documents
"service manual"
SERVICE MANUAL Level 1&2
Technical Publication Direction 2300000 Revision 0 GE Medical
COP Security 15-VP16-CDRW Service manual
Technical Publication
GE Vivid 3 Pro / Vivid 3 Manual 3
chapter 2
2-stroke
Artisan Technology Group is your source for quality new and
Endoscopic Units
assembly and use - Classic Accessories
Firefly™ Inflatable Kayak