Long Term Model USER MANUAL, February 2001
There are seven topical areas.
•
(1) Computing requirements and setting parameters (multipliers, number
of years in each time period, level of complexity, etc.).
•
(2) Power supply from existing and potential thermal sites.
•
(3) Power supply from existing and potential hydropower sites.
•
(4) Transmission and trade.
•
(5) Demand and reliability.
•
(6) Finances.
•
(7) Output files.
All technical users of the LT model will want to consider the questions above in (1). The
level of accuracy, is set by a modeling function, OPTION OPTCR, in Appendix VII and
by the number of discrete variables that are permitted with the new projects. The running
time of the model is significantly affected by the expected level of accuracy.
The software that needs to be installed on the PC for the model to run is:
•
Purdue Code Files - These text files formulate the analysis.
•
GAMS BASE MODULE - This reads the model formulation.
•
CPLEX - This fast solver enables the obtaining of an optimal solution.
•
JAVA - This is needed to set up the windows interface.