Download Roofing and walling
Transcript
44 installation—ends of sheets 10 Ends of sheets This chapter describes how you can treat the ends of sheets to maximise waterproofing, or to stop vermin entering. CUSTOM ORB 10.1 Turn-ups At the high end of roofing, wind can drive water uphill, under the flashing or capping, into a building. To minimise this problem, you turn up the valleys (or pans) at the high end of roofing. (The process is called turning-up (or stop-ending). All roofing on slopes below 1 in 2 (25°) should be turned-up. Figure 10.1.2 Turning-up custom orb Turn-up tools are available for all our roofing profiles except CUSTOM ORB and longline 305 when it is tapered (Figure 10.1.1 on the next page). You can turn-up sheets before or after they are fixed on the roof. If you do the latter, you must have sufficient clearance for the turn-up tool at the top end of the sheets (about 50mm). Turning-up custom orb With pliers, multi-grips or a shifting spanner closed down to approximately 2mm, grip the valley corrugations 20mm in from the end of the sheet and turn up as far as possible (Figure 10.1.2). Be careful not to tear the sheet. Turning-up trimdek and spandek Figure 10.1.3 Turning-up (trimdek shown) Slide the turn-up tool onto the end of the sheet as far as it will go. Holding the tool against the end of the sheet, pull the handle to turn up the tray about 80° (Figure 10.1.3). Turning-up klip-lok You get the best results by first cutting off the corner of the down-pointing leg of each female rib. Do this before you place the sheets on the roof. • With the hinged turn-up tool open: position the tool on the sheet with the locating pins hard against the end of the sheet. • Hold the handles together to clamp the tool onto the tray, and pull them to turn-up the tray 90° (Figure 10.1.4). -ups ted turn Comple Figure 10.1.4 klip-lok tool ready for turn-up Using lysaght Roofing and Walling 2008-9 Edition