Download User Manual
Transcript
GMDE Powervortex 306KTL maintaining the inverter. Before installation: Check for damage to inverter and package. If you are in doubt, please contact us or the distributor before installing the inverter. Before connecting the solar modules to the inverter, check the voltages and make sure they are within the limits of the GMDE inverter specifications. Failure to observe these specifications could void your warranty. Installation: Only trained and qualified personnel familiar with local electrical codes may work with the electrical installations. For optimum safety, please follow the steps described in this manual. Disconnecting the inverter: Please refer to “Disconnecting for maintenance” in section6.1 Before Maintenance. Note that wait at least 15 minutes before proceeding, after disconnecting the hybrid inverter from AC grid, PV panels and battery packs. Operating the inverter: Do not commission the device until the overall system complies with the application-specific national rules and safety regulations. The ambient conditions given in the product documentation must be observed. The machine or installation manufacturer is responsible for compliance with the limit values as prescribed in the national regulations. Only persons who are trained and qualified for the use and operation of this device may work on the device. Maintenance and modification: Only authorized personnel are allowed to repair or modify the inverter. To ensure optimum safety for user and environment, only the original spare parts available from your supplier should be used. Functional safety parameters: Unauthorized changes of functional safety parameters may cause injury or accidents to people or inverter. Additionally it will lead to the cancellation of all inverter operating approval certificates. Global Mainstream Dynamic Energy Technology Ltd. 7