Download Asset Management Process Facility Condition
Transcript
is desirable that condition assessment surveys be based on generally accepted methods and standards consistently applied. (Accounting for Property, Plant, and Equipment 11/30/97.) Construction: The erection, installation, of a new or replacement facility, or an addition in area, volume, or both to an existing facility. (NASA Facilities Mgmt 10/94) Construction Project: A facility project relating to the erection, installation, or assembly of a new facility, replacement facility, or an addition in area, volume, or both to an existing facility. (NASA Facilities Mgmt 10/94) Contracting Officer: Any person who, by appointment in accordance with procedures prescribed by the Procurement Regulation (see appendix C. reference 36, Part 1, Subpart 4), has the authority to enter into and administer contracts and make determinations and findings with respect thereto, or has any part of such authority. (NASA Facilities Mgmt 10/94) Contractor: The supplier of the end item and associated support items to the Government under the terms of a specific contract. (NASA Facilities Mgmt 10/94) Contracts: All types of agreements and orders for the procurement of supplies or services. Includes awards and notices of award; contracts of a fixed price, cost, cost-plus-a-fixed-fee, or incentive type; contracts providing for the issuance of job orders, task orders, or task letters thereunder; letter contracts; and purchase orders. It also includes supplemental agreements with respect to any of the foregoing. (NASA Facilities Mgmt 10/94) Corrective Action: This is the first step in the cost estimating process because it breaks down the best method for remediating a deficiency. Corrective Action Priority: Once the corrective action has been determined, its priority level (critical, serious, minor) must be determined and recorded in the condition assessment work order. Corrective Maintenance: Unscheduled reactive repairs that would not be estimated and planned, but accomplished by local staff or existing service contractors. Note: Not part of the condition assessment process, but a facility maintenance function relating to service calls. (AME, 2003), DO-80, draft 2004 Cost Estimate: An educated guess of what an item would cost to repair or replace. The estimate is based on previous experience with like assets in similar condition and/or developed using a cost estimating program. (Condition Assessment Incident Command, Facility Needs Assessment Section 03/01) Cost Estimating Software System (CESS) (Timberline™ Precision Estimating Tool): A software program used as a tool to assist in determining the cost of repairing identified asset deficiencies. FCAS Student Manual June 2006 209