4 Packaging - Handling Storage (contd.)
4.4 Drawing unit accessories
Contains the elements required for installation and connection of the
switchgear panels to the busbars and cables.
4.5 Reception/Acceptance
■■ Ensure that the materials delivered is complete (list enclosed with the
accessories).
■■ Carry out a visual inspection of the functional units and moving parts.
In the event of an anomaly, make the necessary reserves with the
carrier.
The functional unit must remain vertical on its base, within its original
packaging, during any eventual storage period and until it arrives at
the location of its installation.
4.6 Handling of the functional unit and the
moving part
■■ Truck and train transport (max. 900 kg): by means of forklift truck.
■■ It is imperative to ensure that the forks of the truck are fully engaged
throughout the entire width of the functional unit.
■■ Packaging for air and sea transport: depending on the weight indicated
on the crate.
■■ It is imperative that the forks of the truck are fully engaged throughout the
entire width of the crate.
≥ 1m
16
■■ Pass 2 slings, supporting 1000 kg each under the crate on both sides of
the cross-bars.
■■ The weights of the crates are indicated on their sides.
AMTNoT056-02