Download Installation Operation Maintenance Technical Instructions
Transcript
PIX 5 Unpacking and installation of the equipment (contd.) ■■ Moving part ≥ 2000 A: install the 2 slinging lugs (delivered with the moving part). ■■ On the ground, prepare 2 stringers that will be aligned with the outer edges of the truck. FPX stringers (min. section 30x30 mm) ■■ Hook up the lifting beam and very slowly lift the moving part. ■■ The moving part does not roll along the ground. It must be placed on the 2 stringers. ■■ Place the moving part on the ground, on top of the stringers. AMTNoT056-02 21