way to configure the system is to create work centers, then routes, then parts, and finally
work orders. Users and shifts can be configured at any point and are not dependent on
the other portions of OMS.
4.1 Work Centers
4.1.1 Configuring a New Work Center
To configure a new work center, navigate to the ConfigureÆWork Centers page. This
page lists all of the work centers currently existing in the system as shown below.
To create a new work center, click the “Create New Work Center” link at the bottom
right of the page. The link will open the Work Center popup window as shown below.