Download EXC Turbomolecular Pump Controllers-en
Transcript
1. EXC backing pump relay 2. 3. Backing pump motor EXC Controller Figure 10 - Direct operation of the backing pump 1. 2. 3. EXC Backing pump relay Backing pump motor EXC Controller Figure 11 - Operation of the backing pump through a contactor 3.8 Connect the bakeout band (EXC120/300/300M only) If you have fitted a bakeout band to the EXT pump, insert a suitably rated fuse into the bakeout band fuse holder, then fit the connector on the bakeout band cable to the heater connector on the rear of the Controller (see Figures 3 and 5). EXC Turbomolecular Pump Controllers 29