Download RETOM-51 software users`s guide
Transcript
5) Operation current I OP test I OP , I RES as well as reset ratio test is carried out at U TEST set voltage and CHAR angle by current variation from I MIN to I MAX with ∆I current step. 6) Operating, reset and reorientation time test The test is carries out at CHAR by voltage stepwise variation for induction relays or voltage and current - for static relays (i.e. by power variation). Reorientation time test is carried out in the same way, but the voltage/current angle changes from INI to FIN. 7) Relay test at reverse power (S REV ) shedding The test is carried out provided the relay is used in a directional stage operating without time delay. S REV reverse power shedding value is set by the dispatching service as the max fault power “behind the back” (is entered into the Settings and time window). The test is performed at voltage/current angle equal to CHAR +180, at specified current by power shedding from S INI to S FIN . The relay should not operate. 8) No contact vibration test The test is carried out automatically at CHAR (fault within operating area), at specified test current (as a rule max fault current near bus). The power is changed from S INI to S FIN by voltage variation from U INI to U FIN with set voltage step. Two switches-over of the relay contact mean vibration. 4.6.6 Test Protocol The test results are registered in a protocol. The test protocol window and comments are shown in Figure 3.6.5. Protocol preview Protocol saving with specified name as a file Protocol printing out (see “Protocol printing out” part). It is duplicated by Print item of the Menu Protocol window type view Help Service activation duplicated by Help item of the Menu Exit the Protocol window Copying selected protocol text toPC buffer. It is duplicated by Edit item of the Menu Figure 3.6.5 – Test protocol window RU.BRGA.51000-02 90 Edition 071011 57