Download Installation Manual

Transcript
IINSTALLATION
TOOLS REQUIRED
One
Two
One
One
One
One
One
One
One
One
One
Three
One
One
(1)
(2)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(3)
(1)
(1)
Hammer
1/2 in. Wrench, or Equivalent
9/16 in. Wrench, or Equivalent
7/16 in. Socket Wrench
7/16 in. Nut Driver
Concrete Hammer Drill
3/8 in. Masonry Drill
Soft Face Hammer, or Equivalent
3/16 in. Hex Key Wrench
5/32 in Hex Key Wrench
7/32 in. Hex Key Wrench
1 in. Wooden Blocks (to be used as shims)
5-3/4 in. High Wooden Block (to be used as a shim)
Flat blade screwdriver
After unpacking the turnstile and prior to assembly make sure to inventory all
parts received.
Check to ensure the quantities received match with those shown on the material
list.
Important: Review the enclosed assembly drawings and familiarize
yourself with the various components and their numbers.
MATERIAL LIST
Quantity
Description
Item #
1 each
3 each
3 each
1 each
1 each
Lower Shaft and Bearing Assembly
Center Post Retainer Angles
Center Post
Barrier with 1/8 in. Spacer
Passageway Assembly
(consists of 3 sections)
Ceiling Plate
Control Unit with Cover
Radius Snap-Ons
Raceway Tube
Floor Anchor (right)
Floor Anchor Double (right)
Floor Anchor (left)
Floor Anchor Double (left)
1/4-20 x 2-3/4 in. Hex Head Bolts
1
2
3
4
5R,5L,5C
1 each
1 each
3 each
2 each
1 each
1 each
1 each
1 each
15 each
4
6
7
8
9
10R
11R
10L
11L
Rev 0103.01