Download Installer manual

Transcript
..........................................................................................................................................................................................................................................................................................................................................................................................
Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must be
carried out by a suitably qualified person.
Cut out this page after installation and give it to the owner of the heat pump. Fill in the page for information about installation data in the User manual.
✔
Description
Notes
Signature Date
Brine (page 14)
System flushed
System vented
Antifreeze
Level/Expansion vessel
Particle filter
Safety valve
Shut-off valves
Circulation pump setting
Heating medium (page 15)
System flushed
System vented
Expansion vessel
Particle filter
Safety valve
Shut-off valves
Circulation pump setting
Electricity (page 18)
Fuses heat pump
Fuses property
Outdoor sensor/Indoor sensor
Current sensor
Safety breaker
Earth circuit-breaker
Setting of emergency mode
thermostat
Miscellaneous
Guarantee
NIBE™ F1245
Chapter 1 | Important information
3