Download engine measurements
Transcript
ENGINE BOTTOM END DISASSEMBLY ENGINE BOTTOM END Tool List B C. Qty. Required Piston Ring Compressor Grip: E-Z-GO Part No. N/A .................................................. 1 Piston Ring Compressor Belt, 80 ~ 91: E-Z-GO Part No. N/A .................................................. 1 Bearing Driver Set: E-Z-GO Part No. N/A .................................................. 1 Use clutch puller bolt E-Z-GO Part No. 608429 to remove the drive clutch if it has not yet been removed from the PTO of the crankshaft. CRANKCASE Remove valve cover [A]. D. Position the piston TDC at the end of the compression stroke. E. Remove Crankcase Cover A. Drain the engine oil. If the crankcase cover sticks, tap lightly with a wooden or plastic mallet near the dowel pins [C]. B. Remove the lock screws [A] and the valve clearance adjusting nuts [B], which fasten the rocker arm [C], and pull the rocker arm off the push rods [D]. F. Remove the push rods and mark them so they can be installed in their original positions during assembly. G. C. Remove crankcase cover bolts [A] and crankcase cover [B]. CAMSHAFT AND TAPPETS Remove Camshaft, Tappet A. Drain the engine oil. B. Remove crankcase cover (see Remove Crankcase Cover). Pull the camshaft [A] out of the crankcase. Kawasaki Engine Shop Rebuild Manual Page B-1