Download General Product Specification
Transcript
BDL4230E LCD 99 General Product Specification Europe NAFTA USA O GB21520-2008 CECP certificate (խഏᆏ౨റூ) Supplier option al E FCC Part 15 Class B FCC report and DoC Supplier Yes Sa = Safety E = Electromagnetic Compatibility O = Other which including recycling, energy saving, ergonomics ,GreenMark X=X-Ray Remark: 1. Supplier to provide all approbation documents, samples before CR 2. Supplier to pay approbation samples and transportation cost. 3. Supplier to pay Switzerland approbation cost and provide EN62311 report. 4. AC/DC adaptor have to meet California Energy Commission requirement 5. Supplier have to check regulation information on rating label, carton label, user manual to meet all mandatory regulation 6. Supplier have to apply all mandatory regulation base on sales country. 9.2 EMC Requirements Supplier DVT EMI test result must be submitted prior to FVT samples delivery, and PVT EMI test result must be submitted again prior to PVT samples delivery. Which also has to meet Philips' immunity testing specification. 9.4 RoHS Restriction on the use of certain hazardous substances. Lead, Cadmium, Mercury, Hexavalent Chromium, Polybrominated Bipheny1 (PBB) and Polybrominated Bipheny1 Ether (PBDE)(flame retardant). 9.5 WEEE Producer (Philips) responsible for retailer take back schemes and recycling. -- System implemented. -- Collection and recycle targets. 9.6 Ongoing Regulatory There's a possibility that other regulatory certificates will be required during the life of the product. It is the responsibility of the supplier to provide related documentation. 10. DQE Test Items Template Product Release Test: DQE/DQA: The objective of Design Quality Assurance process is to define the activities to be taken by concerning within the Product Creation Process to manage the quality and reliability of products in a more coherent and systematic approach. The scope of Design Quality Assurance process covers all activities to ensure the design quality and reliability in Product Creation Process that starts from RFQ, Kick-off, EVT, DVT and PVT, Product release phase & Pilot run and CR & MP phase. Design Quality Assurance procedure covers the system flow charts and the activities described as below.