Download Sun Datacenter InfiniBand Switch 648 Administration Guide

Transcript
Port
I4 Switch 0
I4 Switch 1
I4 Switch 2
I4 Switch 3
29
1B-center-P2
4B-center-P2
7B-center-P2
10B-center-P2
30
1B-right-P1
4B-right-P1
7B-right-P1
10B-right-P1
31
2B-right-P1
5B-right-P1
8B-right-P1
11B-right-P1
32
2B-center-P2
5B-center-P2
8B-center-P2
11B-center-P2
33
2A-right-P1
5A-right-P1
8A-right-P1
11A-right-P1
34
2A-center-P2
5A-center-P2
8A-center-P2
11A-center-P2
35
2A-left-P3
5A-left-P3
8A-left-P3
11A-left-P3
36
2B-left-P3
5B-left-P3
8B-left-P3
11B-left-P3
Note – When using CXP to QSCP splitter cables, the P1, P2, and P3 QSCP connectors
are related to the right, center, and left link LEDs respectively.
Related Information
■
“Check Line Card Link Status (Detailed)” on page 37
■
“Display a Route Through the Fabric” on page 47
■
“Perform Comprehensive Diagnostics for a Route” on page 92
■
“CXP Connectors and LEDs to Line Card Switch Chip and Port Routes” on
page 124
Signal Route Through the Switch
By combining the information from “Understanding Signal Routing Through the
Switch” on page 124, it is possible to determine a route through the switch. This topic
describes a sample situation that might occur.
1. A route is initiated at line card LC 6, connector 2A. The left LED blinks.
2. Using “CXP Connectors and LEDs to Line Card Switch Chip and Port Routes” on
page 124, it is determined that the link routes to I4 switch chip 0, through port 35.
3. The Subnet Manager instructs I4 switch chip 0 to use port 4 to forward the link.
4. Using “Line Card Switch Chip to Line Card XBOW Connector Routes” on
page 126, it is determined that the link routes to XBOW connector 7, port 1.
5. The link leaves line card LC 6 and enters fabric card FC 7 at XBOW connector 6,
port 1.
Diagnosing a Problem
131