Download Alaris® System Maintenance v9.5.X Software
Transcript
Chapter 6—Preventive Maintenance Preventive Maintenance—Auto-ID Module and Handheld If the test failed, click Abort Selected Tasks to discontinue testing. Correct the failure(s) before continuing with the tests. 5. IUI Connectors: 'Sandwiching'—the module being tested is connected between the PC Unit and another module. 6. Keypad: Press each key one time. • • 92 Green text—the key was pressed one time and passed the test. Red text—the key was pressed two times, or it was pressed one time and failed the test. If the text is red because you pressed the key more than one time, you can indicate that the test has passed. Alaris® System Maintenance v9.5.X Software User Manual