Download user Manual
Transcript
Fit the breathing hose alternate ends to the Canister. Ensure the white hose end goes to the white coded Canister port. Confirm the ADV LP feed hose is fitted correctly and tightened to a torque of 50-60 in-lbs/5.6-6.7 N-m (Fig. 2.14). Step 8. Remove the Counterlungs from the packaging. Visually inspect them Fig. 2.14 for damage. The Exhale counterlung (Fig. 2.15) is the one with the mushroom valve in the base (this valve is seated in the LCV port). The LCV port cap is removed by a ¼ turn counterclockwise. This gives access to the mushroom valve. Inspect the mushroom valve and LCV port O-ring and the Canister port O-rings for damage (Fig. 2.16). Fig. 2.15 Attach the LCV port cap to the counterlung. Twist the cap until it clicks shut. If not already installed, attach the LCV tube open end to the LCV on the Canister, using the clip provided (Fig. 2.17). Fig. 2.16 Fig. 2.17 14 |