Download Aestiva Anesthesia Machine
Transcript
4 Repair Procedures 4.12.12 Replace common gas outlet (CGO) assembly 1. Follow the procedure in Section 4.12.10 to gain access to the CGO. 2. Remove the tubing that is connected to the CGO assembly. 3. Remove the two screws that hold the CGO assembly (A) in the bulkhead. 4. Pull out the CGO assembly. A 5. Reassemble by following the previous steps in reverse order. 6. Perform the checkout procedure (Section 3). 4.12.13 Remove the bulkhead 1. Follow the procedure in Section 4.12.10 to gain access to the bulkhead. 2. Remove the canisters and the top canister dish (Section 4.12.7). 3. From underneath, remove the two screws that secure the bulkhead assembly. (Screws are located near the holes for the upper canister dish release button.) 4. To reassemble, perform the previous steps in reverse order. 5. Perform the Breathing System Leak Tests (Section 7.2). 1006-0452-000 09/06 4-63
Related documents
- Frank`s Hospital Workshop
Avance Anesthesia Machine
Aespire 7900 Anesthesia Machine Technical Reference Manual
S/5 Avance Anesthesia Machine
- Frank`s Hospital Workshop
Aespire View URM - Frank`s Hospital Workshop
chapter 1 receiving and inspection - MOTOR
Delta VFD-F-User-Manual
MINDRAY Wato Ex-65 Anesthesia Machine Operaters