Download Aestiva Anesthesia Machine
Transcript
Aestiva Anesthesia Machine Install the molded APL Valve Actuator 1. Set the APL Valve Actuator assembly to the MIN position. 2. From the top of the control panel, place the molded APL Valve Actuator into the control panel opening. Align the pointer on the base of the APL Valve Actuator so that it faces about 30 degrees toward the operator from a line parallel to the side of the breathing system (or to a customer preferred position). 3. While holding the APL Valve Actuator in place, swing the control panel to the fully open position. 4. Place the compression spring over the body of the actuator. For an older panel (not modified), also place the thin spacer (spiral ring) in the recess between the spring and body of the actuator. Extraction Tabs (3) Ramp Ramp Hold-down Base Spring 5. Install the hold-down base: • Position the hold-down base over the actuator so that the extraction tabs are positioned between the ramps on the end of the actuator. • Place the heal of your palm over the hold-down base and apply a slight downward pressure. • Move your hand backward slightly so that the hold-down base tilts toward you. • While maintaining a downward pressure, push your hand forward to fully snap the hold-down base in place. 4-56 09/06 1006-0452-000
Related documents
- Frank`s Hospital Workshop
Avance Anesthesia Machine
Aespire 7900 Anesthesia Machine Technical Reference Manual
S/5 Avance Anesthesia Machine
- Frank`s Hospital Workshop
Aespire View URM - Frank`s Hospital Workshop
chapter 1 receiving and inspection - MOTOR
Delta VFD-F-User-Manual
MINDRAY Wato Ex-65 Anesthesia Machine Operaters