Download User Manual - Gill Instruments
Transcript
Contents 2.2.5 Digital Rain Gauge Connections Rain Gauge Cable Entry Gland. Rain Gauge Connections J8 Terminal 2 J8 Terminal 1 Rain Gauge Digital Switch Connection (DIG 1) J8 Hub Box 2 Way Terminal Block Terminal Signal Names Nos. DIG 1 GND Chassis Ground Figure 10 Digital Switch e.g. Rain Bucket Supplied 6M Cable 2 1 Terminal Post Clear Black Signal Names Switch Contact Return Switch Contact Screen Wire Chassis Ground MetPak RG DIG 1 Rain Gauge Connections To connect the Rain Gauge 6 Metre lead to the Hub Box. Last Change 12 March, 2013 1. Open MetPak RG’s hub box by unfastening the four screws. 2. Locate connector J8 (see Figure 3). 3. Pass the cable through one of the gland nuts (see Note below). 4. Connect the cable as detailed in Figure 10. 5. Attach the cable’s screen wire to a terminal post. 6. After connection, securely tighten the gland nut to prevent moisture ingress. 7. NOTE: The MetPak RG Hub Box cable glands contain spring loaded metal leaves that are designed to make a ground contact with cables that have an overall braid screen. Care is therefore required when inserting and removing cables through the glands to prevent damage to the metal leaves. MetPak RG User Manual © Gill Instruments Ltd Page 13