Download Mantis 5000 Specifications
Transcript
Figure 47. Removing the light seal. Note The lockdown lever is accessible just underneath the DRA base plate. 5. Slide the lever on the instrument front panel to the right. 6. Remove the front lockdown pin. 7. Tilt the front end of the accessory. Using the accessory handle, lift the DRA up and out of the sample compartment and store it in the accompanying wooden box. 8. Replace the sample compartment front panel. Collecting baseline scans When taking reflectance measurements using a reflectance accessory, three types of baseline corrections can be applied to the scan data. A simple correction is used in the diagnostic scans that is quick and does not require zeroline or reflectance standard data. A second and third method uses a zero baseline correction that can be applied by one of two methods: either the sample beam can be blocked off from the integrating sphere during the 0%R baseline scan or a light trap can be installed over the sample reflectance port. Note The blocked beam method is discouraged by ASTM E 903 for reflectance measurements because the effect of scattered light incident on the sphere wall is not included in the data collection. During transmission measurements, either the standard baseline or the blocked beam method should be used. The spectrophotometer and accessory must be warmed up for 30 minutes prior to recording any of these baseline scans.