Download Bosch NFN 67.. Specifications
Transcript
Remote maintenance of a S7-PLC[FREEWARE without support] You have to solve a problem in the PLC-program, but the installation is not placed nearby? No problem, start your PG-2000-software with "option teleservice", activate your modem and after selection intra PG-2000If you have to accomplish modifications in your installation, connect the software access to the PLC is possible as if being on-site. PC with the PLC and start your programming package PG-2000. With this software you have one and the same user interface for S5 and S7[FREEWARE without support], so you don’t have to switch between both versions, just as it is with most of other packages. Data logging of your PLC Backup of formulas without knowledge of PLC You shortly need a logging of your PLC’s operating states respectively are on the way of figuring out a problem and have no datalogger? No problem, connect the PC, start the PG-2000-software with "option datalogger", define relevant variables, appoint timestamp and then the recording starts running immediately. The data will be stored on the fixed You consistently have to back up formulas which are stored in data blocks or back up production protocols, but the employee in charge has no disc according to the configuration. knowledge of PLC-programming respectively handling PC-programs? No problem, install the PG-2000-software with "option DB-backup" on your PC and connect it with the PLC. The employee only has to click on a symbol on the desktop of the PC and the data blocks of the parameterised PLC will be stored on the fixed disc. Afterwards the program closes itself and the mentioned employee didn’t had to accomplish an intervention on the program. Project/history-administration of PLC-programming 91 87 89 STEP5 / STEP7 Visualisierung programming /-OPC-Server Zubehör SPS - Kommunikationstreiber Programming/controlling of S5/7[FREEWARE without support]-PLC’s Who doesn’t know this? When accessing the PLC you find out that parts of the program flow has been changed and none of the colleagues/employees are responsible for it? Therefore install the "option controller" for the PG-2000-software, and every activity of the employees working with the program will be recorded. So you can identify the one employee very quickly and changes are ex post comprehensible, too. 75 91