Corrective maintenance
Preliminary actions
prior to intervention
On-site
actions
Forward actions post
to intervention
Fill up the maintenance form,
Dismiss from the
Discard the faulty unit
which shall include at least:
station by
if not repairable
• the failure origin,
applying proper
• the replaceable parts changed
MTRC procedure
Deliver the faulty LRU
• possible adjustment or design
characteristics to review
OR
to workshop if fixing
of SRU(s) will be
sufficient
Send the LRU to
Faiveley Hong Kong
OR
Ltd if it is specified
that it can only be
repaired by
manufacturer
PHILOSOPHY
B - 64
Platform Screen Doors • Line & Workshop Maintenance