Download Section 1 - Community Transit
Transcript
REQUEST FOR PROPOSALS - RFP #50-07 ADVANCED PUBLIC TRANSPORTATION SYSTEM (APTS) PROCUREMENT SECTION 2.0 - PAGE 51 Zone 4. All racks shall be APC NetShelter SX, 42U 600mm wide by 1070mm deep. N. All servers, wiring, network, back-up power/filtering units shall fit within the racks, and all wiring shall be clearly labeled and physically supported using support devices that are compatible with the supplied racks. Plans for rack layout shall be submitted in advance for approval by Community Transit. 2.07.02 Functional Requirements 2.07 .02 .01 C ENT R AL P RO C E S SI NG S Y ST E M A. The system shall include central application software and hardware as required to process APC data, process AVL data, manage configuration data, manage and log incidents and events, and report diagnostic information. B. The Central System shall be compatible with Community Transit‟s existing HASTUS scheduling software, HASTOP, Rider, Trapeze OPS, and Trapeze Yard Management. HASTUS will provide the Central System with route, schedule, and run data as well as stop locations. Trapeze OPS will provide operator vehicle assignment information. C. HASTUS data to be provided by Community Transit includes alphanumeric identifiers for route, timepoints and stop codes. The Contractor shall be responsible for importing alphanumeric information and translating it as required into numeric information as may be required for the operation of the APTS. In its Proposal, the Contractor shall describe any proposed approaches to providing such translation, and describe how the process can be managed on an ongoing basis assuming that Community Transit retains alphanumeric identifiers in its business systems. D. Community Transit desires that the Central System provide a data output compatible with the HASTUS-ATP runtime analysis module. Additional information is contained in Attachment 3. E. The Central System shall include a two-way interface with Community Transit‟s existing Trapeze PASS paratransit dispatching software. F. The central processing system shall provide the following functionality: G. (1) Manage the communications with all APC/AVL equipped vehicles (2) Import schedule and operator data from the HASTUS system operated by Community Transit (3) Create and manage all APC and AVL configuration data (4) Create and manage APC reports by Community Transit, including but not limited to passenger flows by door, passenger flows by stop, lift use, bike rack use, and loads (5) Create certain National Transit Database (NTD) report data (6) Create diagnostic and system performance reports (7) Provide a real-time AVL interface to external systems to provide the location of all APC/AVL and AVL-only equipped coaches. The AVL map system shall be based on standard digital GIS data provided by the