Download TCPWeb_user-reference
Transcript
1. In WebScheduler, go to Tools > Transfer job code information. 2. Select the job code(s) you would like to transfer from schedule to hours. 3. Enter the date range to transfer in the From and To fields. Alternatively you may select a date range from the drop down list. 4. Place a check next to Combine schedule criteria and the criteria specified below if you wish the transfer to affect the employees included by the Scheduler’s criteria (View > Change scheduler criteria) and the employees included by the Transfer Job Code Information criteria (Criteria button at the bottom). Schedules for any period can be transferred to hours as long as they are after the start of the current TimeClock week (the Current Week displayed in the status bar of WebManager). The transfer is not affected by the week opened in Scheduler. You will receive an error message if any portion of the date range is before the current week. 5. To choose which employees should be affected by the transfer, click Criteria, choose a filter, configure it, and click OK. If you want to include everyone (that you have access to) then do not worry about the Criteria. 6. Click Preview to see a list of the records that will be transferred. None of the data will actually be transferred. 7. Click Process to perform the transfer. 17.6. Scheduled Labor Costing The Labor Cost Analysis provides an hourly breakdown of hours scheduled and estimated labor costs in dollars and as a percentage of sales. A summary at the top of the window provides total hours, wages, sales and labor percentage. 1. In WebScheduler, go to Tools > Calculate scheduled labor cost. 2. Select either View daily figures or View weekly figures. To display labor as a percentage of sales, View daily figures must be selected, and estimated sales must be entered on an hourly or daily basis. 3. To choose which employees should be included, click Criteria, choose a filter, configure it, and click OK. If you want to include everyone (that you have access to) then do not worry about the Criteria. 4. To choose which job code should be included, click Options, select Include only selected job code items in labor cost, select the job code(s) you want to include, and click OK. If all job codes should be included then do not worry about this. 5. Select the day or week you wish to view using the << and >> buttons to move back and forward in time or by clicking Period and selecting the period. 6. If entering sales on an hourly basis (if Edit sales by the hour is enabled in the Labor Cost Options) then double click on the record’s Sales column and enter the estimated sales. The labor percentage will then be calculated based on the wages and sales. © Data Management, Inc. 2010. All Rights Reserved. This documentation may change without notice.