Download to - Phoenix Project Manager
Transcript
• • • • • • • • • • • • • • • use these new styles by opening the Bar Format window, and clicking the "Reset to defaults" button. Feature: Added constraint type to the available Activity List columns. Feature: Improved the "Group by Codes" feature in the Network Diagram view to automatically collapse activities on to the same line where it makes sense. Feature: Added XER import and export (with the ability to use Activity Codes as the WBS structure, and vice versa). Feature: The trial version of Phoenix can now be directly activated into the full Express or Professional version without the need to uninstall and reinstall Phoenix Project Manager on Windows (Mac already does this). Feature: Criticality can now be defined by whether or not the activity is on the longest path instead of just checking for low total float. Fixed: Redesigned the Project Info dialog for better usability. Fixed: Activities with original durations that are inconsistent with start and finish dates are now automatically repaired on load. Fixed: Multiple selection is now correctly disabled in the Code Library. Fixed: Global formatting of monetary values now also supports negative values. Fixed: Calculations of estimated remaining cost in reports now takes activity progress and budget into account instead of billed amounts. Fixed: Custom mouse cursors set inside of the Activity List header or the Timescale are now correctly reset on Mac OS X. Fixed: Repeating non-works are no longer given explicit expiration dates. Fixed: Moved the determination of driving relationships to the backwards scheduling pass, where more than one driving relationship per successor can be identified and marked. Fixed: Auto-numbered activities are now pasted in the same order they were in when they were copied. Fixed: Phoenix now makes it impossible to set every weekday as a non-work, which would only result in a project that would never finish. March 9, 2009: Version 1.4.0.18 • First Mac OS X version of Phoenix Project Manager released. • Feature: Budget and Billed information can now be added to bars in Barchart view. • Feature: Activities can now be filtered by remaining duration and percent complete. • Feature: Billed amounts for activities now automatically update with changes to the activity's progress. • Fixed: Crash when changing Activity Code order in the Organization format window.