Download "user manual"

Transcript
3
Field Surveying
Start-up sequence
- Press ↵. Display #5 should now look like this if you
have not made any changes to the previous screen:
Validated name for your job, file now open
Described in page 3-31
The symbol ( ) appearing to the right of the
validated file name indicates that the file is now open
and ready to receive the field data.
You have now reached the end of the unconditional
start-up sequence, which means that you can now
have free access to any of the displays available on
your palmtop.
Unless the L (or K) processing mode is now
displayed in the status area, wait for this letter to
appear before proceeding with your work. When
displayed, this letter denotes successful LRK (or
KART) initialisation and the ability for the rover unit to
start your work.
NOTE: OTF initialisation is the default initialisation
mode run by the unit.
3-4
DSNP