Download User Manual - Igage Mapping Corporation
Transcript
Precise Surveying - Field Applications & Concepts In post-processed surveying, the rover asks you to stay still on the known point for a preset occupation time. This particular event in the logged raw data file will help the post-processing software initialize more quickly. The known point can be a point previously surveyed in postprocessing static mode. Initializer Bar Baseline 1. 2. Base Base Rover Rover Reference Point Reference Point The Initializer Bar method can be used more especially when the survey takes place in the vicinity of the base (short baseline). It makes use of an initializer bar, also called “kinematic bar”, mounted at the base. The bar is attached to the antenna base and, for a limited time, the rover antenna as well. The bar in fact defines a 20-centimeter, known baseline length. After a preset occupation time, the rover antenna is moved to the rover pole, taking care not to obstruct the antenna during this action. Initialization in RTK Surveying Field Approach In real-time surveys, the position status will at all times inform you of the real status of initialization. At power up, the time required to get a fixed solution, i.e. the time for the rover to get initialized is called TTFF (Time To First Fix). Obviously, for a given baseline length, the better the operating conditions (low DOP, large number of received satellites, open sky conditions), the easier the initialization, and therefore the shorter the TTFF. 59
Related documents
ProMark 800 Reference Manual, February 2013
2009 PDF Catalog - Absolute Accuracy Surveying Equipment
ashtech MobileMapper 10 Specifications
Sagitta Seismic
ashtech ProMark 200 Specifications
settop radio-link - Al
FAST Survey Software
USERS MANUAL - Empirical Labs Inc.
USER GUIDE SUNNAV S100 - C T Communication Technology
Multicube Explorer User Manual Version 0.5
ADL Vantage/ ADL Vantage Pro
UTOPIA INPUT DESCRIPTION The UTOPIA