Download Scheduling Hull Block Construction
Transcript
The Project WBS can be a combination of ship systems (SWBS) and interim products (PWBS). Each type of WBS has its value in the development of the new build project. For this sample project, however, the plan will be based on the organization of work by interim products: • Manufactured Parts • Sub-Assemblies • Hull Blocks • Hull Grand Blocks • Ship Zones 11