Clear leveling values before leveling:
Selecting this check box indicates that any delays previously entered as a
result of leveling, or as a result of manually entering leveling delay, are to
be cleared before the next leveling operation is done. This is selected by
default.
Leveling range:
Specify whether you want the entire project leveled or only those tasks
falling within a specific time range.
Leveling order:
Specify the order in which you want Microsoft Project to delay or split
tasks that have over-allocations. After Microsoft Project determines which
tasks are causing the over-allocation and which tasks it can delay, it uses
the order you specify.