RATO 6.3 Interlocking system
For a main route only a primary overlap must be defined, which includes the
closest track section in advance of the route exit signal (figure 6.3:10), when
–
there is a route point on the track section in advance of the route exit
signal,
–
the route point is a trailing point seen from the direction of the signal,
–
the distance between the route exit signal and the fouling sign point of the
route point in advance of the signal is less than 60m and
–
there is no passenger platform on the track in rear of the signal and overlap
0 is not required for the signal in the engineering configuration
requirements.
< 60m
Figure 6.3:10 Only a primary overlap on the route.
For a main route only a primary overlap must be defined, which includes the
closest track section in advance of the route exit signal (figure 6.3:11), when
–
there is no powered point on the track section in advance of the route exit
signal and
–
the distance between the route exit signal and the fouling sign point of the
route point in advance of the signal, which is a trailing point, is at least
60m.
≥ 60m
Figure 6.3:11 Only a primary overlap on the route.