Download 6 signalling systems

Transcript
69
RATO 6.3 Interlocking system
–
–
–
the track section in advance of the shunting signal which starts the main
route is vacant, if the distance between the shunting signal, which is
closest to the main signal connected to shunting signals and the main
signal is at least 300m,
the track section in advance of the shunting signal which starts the main
route becomes occupied, if the distance between the shunting signal, which
is closest to the main signal connected to shunting signals and the main
signal is a distance of less than 300m, or
the track section in advance of the shunting signal which starts the main
route is vacant, if the main signal connected to shunting signals cannot be
seen from any of the shunting signals connected to the main signal in
question.
6.3.6 Shunting route
6.3.6.1 Setting a shunting route
It must be possible to set a shunting route between two consecutive shunting
signals through all paths made possible by the route points between the shunting
signals in question.
The shunting route conditions are the same as the main route conditions
exclusive of the exceptions stated here.
The shunting route must end at
–
a main signal,
–
a block signal,
–
a shunting signal,
–
a track equipped with a line block system on the line,
–
a track section where the track vacancy proving ends, or
–
a track section, at whose boundary a board limiting the shunting work will
be positioned.
A shunting route must be set without flank protection.
A shunting route must be set without overlap.
The shunting route must become set, even if its track sections are occupied. It
must be possible to determine the track vacancy proving of specified track
sections in the basic shunting route conditions.
Setting a shunting route in such a way that the route entry signal of the shunting
route to be set is the route exit signal of a set main route, must be prevented
during the checking of the basic route conditions.
The displaying of an aspect permitting driving of signals included in the
shunting route must be on condition that the locking and monitoring conditions
for a shunting route are fulfilled.
RATO 6 2009-12