Download 6 signalling systems
Transcript
171 RATO 6.6 Technical section 6.6 TECHNICAL SECTION A structural subsystem to be used in the railway system must have commissioning approval issued by Finnish Transport Safety Agency. A structural factor in use, associated with signalling elements or signalling systems must have approval or permission for field test issued by Finnish Transport Agency. The requirements of the signalling systems manufacturer must be taken into account when installing the signalling system and planning the installation. 6.6.1 Mechanical parts of the signalling system The signal or signal lamp unit must be directable. The signal or the signal lamp unit must be directed in such a way that the signal aspect is visible from the signal for the distance according to the signal sighting requirement, as well as in rear of the signal for as long as possible over the distance that begins at the signal and ends at the distance of the sighting distance requirement from the signal (fig 6.6:1). Signal aspect must be visible altogether at least on half of this stretch and on as long part as possible Signal aspect must be visible at some point on this stretch 10% of the required sighting distance Aspect must be visible on this stretch ¼ of the required sighting distance Required sighting distance Figure 6.6:1 The visibility of the signal aspect on the distance according to the sighting distance requirement. 6.6.1.1 Installing the signalling apparatus The signalling apparatus must be installed outside the structure gauge (ATU) of the track that the signalling apparatus is installed on and the adjacent track in such a way that the signalling apparatus with its installation tolerance is located outside the ATU. In relation to the main track, the main track ATU must be used, the side track ATU must be used for the side track and the broad-gauge track ATU must be used for the broad-gauge track. When installing a signalling apparatus on a broad-gauge track or next to it, the ATU of the main or side track of the broad-gauge track in question can be used if the signalling apparatus is positioned inside the broad-gauge track ATU, and the signalling apparatus can be easily removed or transferred outside the broad-gauge track ATU. The ATU and its possible gauge widenings must be taken into consideration according to the requirements stated in RATO part 2, “Track Geometry”. RATO 6 2009-12