Download CRC Technical Reference Manual
Transcript
Installation Checking operation with a construction card CRCs come from the factory preprogrammed to recognize a construction card with a special card code. The CRC will only accept the construction code when no user data has been downloaded to it. Once the CRC battery has been charged, the construction card can be used to check the operation of the electric door lock, or other releasing mechanism, in order to make adjustments where necessary. Remember, to use the construction card the CRC must be factory fresh, with no card information downloaded. After making all required adjustments and powering up the system, temporary cards can be created for the construction staff to use as required. When the installation of the system is complete these temporary cards can be deleted or allowed to expire. 5.12 Technical Manuals Online! - http://www.tech-man.com CRC Technical Reference Manual