Download Net Commander Manual
Transcript
However when you run report like in Figure 33 you can see the date range circled in red. Figure 33 – Sample Report. After you run the report first time but happened to forget about the date range; you can simply change the date range in the Control Panel and then move your cursor up to the menu and rerun the report. The Facility Range should already be set from the first time you ran. To run a different report with same Facility Range, just select from the menu which report you want to run. There is no need to reselect the Facility Range because Net Commander remembers the last Facility Range setting. 20