Download Safety Controller Ethernet Interface Module User`s Manual
Transcript
Procedures before operation MELSEC-WS 8. Procedures before operation (1) Procedures before operation (a) Communications with the QJ71E71-100 The following is a procedure to establish communications between the WS0-GETH and the QJ71E71-100. Figure 29: Procedure before operation (communications with the QJ71E71-100) Procedure before operation QJ71E71-100*1 WS0-GETH Mount the QJ71E71-100 on the base unit. Connect the WS0-GETH to the MELSEC-WS CPU module. Connect an Ethernet cable. Connect an Ethernet cable. Configure network parameters (for Ethernet) with GX Developer. Configure configuration data with Setting and Monitoring Tool. Create a ladder program. Write the configuration data to the module with Setting and Monitoring Tool. Execute a PING test to check for existence of the WS0-GETH. Check operations. End *1 For details, refer to the Q Corresponding Ethernet Interface Module User's Manual (Basic). 66