Download pick variable flow service manual
Transcript
PICK VARIABLE FLOW SERVICE MANUAL Steam control valves is FULL OPEN (continued) Temperature rise may be greater than originally specified Adjust heater operating demand to original specifications. Consult factory for upgrade to a different heater or steam valve if demand can’t be altered Plugged steam strainer basket Remove steam line basket, empty debris, flush basket and reinstall Clean injection tube. Contact factory for possible alternate materials Disassemble and inspect injection tube. Repair injection tube or return to Pick Heaters for complete reconditioning. Increase steam supply pressure at boiler or PRV. Consult Pick Heaters for re-sizing of steam valve. Confirm boiler output, and overall steam requirements. Confirm that all steam supply valves are open -Check for restrictions in steam supply piping. -Upgrade supply pipe size (see “Steam Supply” section for steam line sizing calculations) -Install pressure reducing valve -Consult factory -Reduce setting Deposit accumulation on injection tube Damaged injection tube Steam boiler or pressure reducing valve (PRV) set lower than specified Steam boiler undersized Steam supply valve NOT FULL OPEN Steam supply piping or components are undersized or restricted Water pressure is too high Supply pressure higher than design Water pressure reducing valve is set too high PROBLEM: Heater will not heat liquid to the desired temperature. OBSERVATION PROBABLE CAUSE ACTION Pump not circulating water Inspect and repair pump as necessary 22 14 12-13 23 See Installation Manual 22 23 PAGE See parts list 6