Enterprise Timetabler
_______________________________________________________________________________________
The user can manually screen the list further. Clicking on this button allows the user to add
5
or remove items from the screening list whether or not they satisfy the criteria specified by
the Suitability(ies) list. For example, a user may require a Lecture Theatre with blackout, but not
Lecture Theatre X. The lecture theatre could be removed from the list manually.
When the user creates a custom screening list in this way, the selected suitabilities are removed
since they are no longer an accurate representation of the requirements of the activity.
4.1.2 Defining a requirement for fixed resources
The user may also indicate that the resource requirement is fixed or “preset” by selecting resources directly
from the list (4). If one or more items are selected then the number required control (1) will be greyed out and
set to the number of resources selected from the list.
To change the requirement without making further changes to the activity, click the
button.
If the activity is currently unscheduled, the requirement will be changed and will now become a scheduling
constraint. Blue diamonds will only show at time slots where the requirements can be met.
If the activity is currently scheduled, the selected resource will be allocated as well as becoming a
requirement for the activity. Working this way forces the allocation regardless of the availability of the
resource at the required time, so has the potential to create a double-booking of that resource. If a double
booking is created, this will appear in the Status panel as an additional Scheduling Problem.
4.1.3 Available Column
Having defined the requirements, clicking on the
activate the third column; show available time/resource list.
button at the bottom of the Resource Editor will
Figure 96 Available resources
This column takes the range of the list (4) as the basis for the search regardless of the selection. The
assumption is that the user is searching for all suitable and available resources so any preset requirement can
be ignored for the purpose of the search.
The show available time/resource list shows the resources that are suitable and available at the time at which
the activity is scheduled. The user can select any resource from the show available time/resource list and
click
to change the allocation.
Where the currently allocated resource is preset, the allocation of a different resource from the available
resource list will replace the preset resource so that requirement and allocation are both changed. If the
original resource was not preset, the new resource is allocated as a wildcard resource. In this case the
requirement is not changed.
This control is similar to the Resource Reallocation Palette in Syllabus Plus, but with
an important difference. In Syllabus Plus, if the resource is “preset” that is
interpreted as “the activity must have this resource”. Therefore, in Syllabus Plus,
you must change the requirement to a wildcard before you can allocate a different
resource. Enterprise Timetabler assumes that if you select a different available
resource then you wish to change the requirement as well as the allocation of the
currently preset resource.