Download Enterprise Timetabler User Guide
Transcript
Enterprise Timetabler _______________________________________________________________________________________ The user can manually screen the list further. Clicking on this button allows the user to add 5 or remove items from the screening list whether or not they satisfy the criteria specified by the Suitability(ies) list. For example, a user may require a Lecture Theatre with blackout, but not Lecture Theatre X. The lecture theatre could be removed from the list manually. When the user creates a custom screening list in this way, the selected suitabilities are removed since they are no longer an accurate representation of the requirements of the activity. 4.1.2 Defining a requirement for fixed resources The user may also indicate that the resource requirement is fixed or “preset” by selecting resources directly from the list (4). If one or more items are selected then the number required control (1) will be greyed out and set to the number of resources selected from the list. To change the requirement without making further changes to the activity, click the button. If the activity is currently unscheduled, the requirement will be changed and will now become a scheduling constraint. Blue diamonds will only show at time slots where the requirements can be met. If the activity is currently scheduled, the selected resource will be allocated as well as becoming a requirement for the activity. Working this way forces the allocation regardless of the availability of the resource at the required time, so has the potential to create a double-booking of that resource. If a double booking is created, this will appear in the Status panel as an additional Scheduling Problem. 4.1.3 Available Column Having defined the requirements, clicking on the activate the third column; show available time/resource list. button at the bottom of the Resource Editor will Figure 96 Available resources This column takes the range of the list (4) as the basis for the search regardless of the selection. The assumption is that the user is searching for all suitable and available resources so any preset requirement can be ignored for the purpose of the search. The show available time/resource list shows the resources that are suitable and available at the time at which the activity is scheduled. The user can select any resource from the show available time/resource list and click to change the allocation. Where the currently allocated resource is preset, the allocation of a different resource from the available resource list will replace the preset resource so that requirement and allocation are both changed. If the original resource was not preset, the new resource is allocated as a wildcard resource. In this case the requirement is not changed. This control is similar to the Resource Reallocation Palette in Syllabus Plus, but with an important difference. In Syllabus Plus, if the resource is “preset” that is interpreted as “the activity must have this resource”. Therefore, in Syllabus Plus, you must change the requirement to a wildcard before you can allocate a different resource. Enterprise Timetabler assumes that if you select a different available resource then you wish to change the requirement as well as the allocation of the currently preset resource. Ref: 3041 54 Copyright Scientia Ltd 2010