Download Lucent Technologies Release 6 Security Camera User Manual

Transcript
Issue 5
May 1998
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets 555-230-112
5
Install and Wire Telephones and Other Equipment
1145B Power Supply
Page 5-50
1149 Battery
-4 8V
-48V
RTN
RTN
1
17
2
18
3
19
4
20
5
21
6
22
7
23
8
24
9
25
10
26
11
27
12
28
13
29
14
30
15
31
16
32
Unit No.
Connected To :
-48V
-48V
RTN
RT N
1
1145 Power Unit
On Battery Reserve
Charging Battery
Output Power On
2
17
18
3
19
4
20
5
21
6
22
7
23
8
24
9
25
10
26
11
27
12
28
13
29
14
30
15
31
16
32
Unit N o.
Connected To:
0004_1 PDH 062596
Figure Notes
1. Wall-Mounting Plate
2. Second 1146B Power Distribution Unit
3. “T” Cable (H600-347-G7)
Figure 5-21.
4. First 1146B Power Distribution
Unit
5. 1145B Power Unit
Expanded Power Distribution Unit